博客

布线发展史

2013-9-24

Prevent Errors, Limit Complexity and Reduce Cost Associated with Cable Certification

Perhaps the last thing a buyer of cable test equipment thinks about when looking for a product is how to prevent testing errors—and that’s a big mistake. While issues such as cost, standards and specifications including bandwidth and test speeds are important, decision makers should not ignore the issues of project errors and the subsequent delays they can cause.

2013-7-10

ETL 验证的重要性

 If you’re in the cable testing business, you should know about ETL Verification.

2013-3-28

免费线缆测试管理软件 – 收获 LinkWare™ 带来的好处

如今,测试先进布线设备非常复杂,仅一个 5e 类测试报告就包括超过 400 个数据字段。由于一般的作业就包括几百条甚至几千条链路,即使网络工程师检查了所有结果并确定结果都合格,但关键性的问题依然存在:您如何判断是否使用了一个不正确的测试规格或错误的适配器呢?是否所有的测试仪都使用了正确的软件?您是否得到了预期的余量并且它们是否一致?

2013-3-11

如何通过环型通量提高多模测试准确性

Anyone who’s ever tested a multimode fiber optic link with light sources from different equipment vendors will know that the loss measurement can vary by as much as 50 percent. 若未进行适当控制,则多模光源会以不同的方式将光注入多模光纤。  即使采用同一制造商生产的光源,但在不同的发射条件下也会产生不同的链路损耗测量结果,最终出现不同的 — 并且通常令人困惑的 — 测试结果。

2013-2-08

环形通量 —它是什么?为什么需要关注?

随着 LC/MPO 盒之类低损耗光纤组件的推广应用,损耗预算(测试限制)变得越来越小。这样一来,安装商会发现以前进行光线测试的方法和假设不再适用。

虽然电信工业协会 (TIA) 依旧允许每个连接器的衰减为 0.75 dB,但工厂抛光连接器的衰减接近 0.2 dB。因此,在测试 TIA 极限值时,安装商面对诸多的不确定性。换句话说,他们的测试实践需要合理化,而不求完美。

2013-1-10

Finding the keys to success in the MPO datacenter

当所有公司都在为了支持日益庞大的业务程序解决 IP 流量需求的激增问题时,许多公司正在利用光纤网络设计各自的数据中心,以支持服务器、交换机和存储区域网络之间 10G 或 40G 以太网连接,以及用于核心交换的 100G 以太网和路由主干连接。

页码

 
 
Powered By OneLink